Please describe pinouts. I need UART..

EngSammy
Offline
Last seen: 7 months 3 weeks ago
Joined: 2020-03-05 13:08
Posts: 6

you mentioned in #43 that wave soldering for the AL pcb , is this true ? or do you mean reflow oven ..

and if any of these methods is used , Does it use normal profile or a special profile ?

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Normal profile seems to work for solder paste with low temp melting point.  

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

eptv
Offline
Last seen: 1 month 2 weeks ago
VESC Original
Joined: 2018-10-21 21:20
Posts: 35

Hello Vadicus,

Vally & Eva are waiting your controller )

 

IMG_20200412_075633.jpg

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Are those whale fishing poles? If so, I would understand the desire for 20kw or maybe more. Otherwise, what are the specific requirement to use so much power on a spool?

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

argo
Offline
Last seen: 4 years 6 months ago
Joined: 2020-03-02 00:26
Posts: 1

This looks like a fun guessing game  laugh

Are Vally and Eva used for towing up paraglider and/or hang glider pilots?

For HG we need up to 90kg tug-force, which would explain the 20kW.

eptv
Offline
Last seen: 1 month 2 weeks ago
VESC Original
Joined: 2018-10-21 21:20
Posts: 35

This is paragliding towing. Complicated thing. I did many tests on 75300 (https://www.youtube.com/user/eptveptv123) for one seater wings. And calculated that I need 30kw controller for double seater (tandems).

I need 150Kg of continues force without overheating at all. And controller must handle high volts when paraglider is flying back. About 20Ms for safety.

Also I need relatively small 1-2Kg (7-10A) forces to keep rope tension when paraglider is flying back from the winch.

Your controller seems very promising for this application.

 

Could you inform about good DC-DC battery to 12v 5A?

IMG_20200402_184433.jpg

I connected internal fans to 75300 AUX port. And I found that it is impossible to start fans when motor is working. It seems like 75300 12v used to control fets.

 

Also, I wrote application for safely control (https://www.youtube.com/watch?v=-R5f-PkWRyo) towing. It can be found under branch 'skypuff':

https://github.com/ddosoff/vesc_tool/tree/skypuff/application

https://github.com/ddosoff/bldc/blob/skypuff/applications/app_skypuff.c

TechAUmNu
Offline
Last seen: 3 months 2 days ago
Joined: 2017-09-22 01:27
Posts: 575

The 75300 can only supply 1A total on the 12v, since the 12v is also used to generate the 5v and 3.3v you probably can't use more than 0.8A before you have a problem.

Those delta fans can draw like 2-4A each depending on the model so best to use something external to the vesc in this case.

Here are some dcdc that might work 

https://www.mouser.co.uk/Power/DC-DC-Converters/_/N-brvxe?P=1y7vcxwZ1yqwoy7Z1y7vd1oZ1y9291pZ1y9f6f8Z1y9f6fxZ1y9eb4rZ1y9f6fdZ1y86kd3Z1yqwokzZ1yqwpuvZ1y9hpilZ1y985msZ1yqwokoZ1y9f6fuZ1yqwputZ1yqwoq8Z1y9f6fkZ1yqwpuzZ1y9f6ewZ1yqwolcZ1y86ke3Z1y8t534Z1y8t533Z1y9hq46Z1y9f6fzZ1yqwpv1Z1yqwp8dZ1y9eb4nZ1yqwpuqZ1ypzfgvZ1yqwp3iZ1y7wmxvZ1y9eb4mZ1yqwp4qZ1y7w07kZ1y91mfwZ1y9fqjsZ1z0ixqtZ1y9f6exZ1y9eb36Z1y7y7rgZ1z0k0d3Z1z0j09sZ1yqwp7hZ1y7vd1uZ1y7w07rZ1yxt7ff&Rl=brvxeZgjdhnxZ1yxt7fcZ1yxkadtSGT&Ns=Pricing%7c0

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

So these work as servos? 

Having fans on the stator would make sense if the heat can escape the hub. I saw some guys pumping air through the hubs. That seemed to help with cooling. 

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

eptv
Offline
Last seen: 1 month 2 weeks ago
VESC Original
Joined: 2018-10-21 21:20
Posts: 35

Not like servos, but I count steps to control position. Force is applied and removed in a smooth way. Automatic take off sequence and wind up.

 

Fans make cooling speed about 5 times more:

IMG-20200409-WA0015.jpgIMG-20200409-WA0017.jpg

 

Do you have news about controller?

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

We are adding a lot of improvements to the design for reliability. The hope is to start making a few prototypes in early May. Virus permitting.

Saw the "antisex dampening" in your code. It makes sense now after watching the video.

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

eptv
Offline
Last seen: 1 month 2 weeks ago
VESC Original
Joined: 2018-10-21 21:20
Posts: 35

I am unhappy that I have to add additional DC-DC and circuit to run fans. Of course there should be a direct firmware controlled 12V 5A output to fans with powerful controllers..

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

I am unhappy about a few things but I am happy about a lot more other things. The net sum of this is that I am on the positive spectrum of happiness. And I think that's what matters.

As for DC/DC, 12 at 5A amounts for 60w of power. It would take some space in the controller and take some engineering, testing, etc. 

 Yes, it can be done as a part of the controller and I think I'll do it at least as an option, but for now, it's not the focus because it can be easily added off the shelf.   

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

lamonz88
Offline
Last seen: 3 months 5 days ago
Joined: 2020-02-07 18:53
Posts: 9

Seal controller's shell- enclosure hermetically and add in/out PC water cooling quick change connector's  on both end's ! and get a radiator for oil cooling , and use it with transformer oil , You will need a water cooling pump tho . D5 Pump's are the best choice , very strong and reliable . Don't know how well  if it would handle oil tho but . Cooling would be hell of a lot more efficien't that with air . Just  need to tap in-to main battery https://www.overclockers.co.uk/xspc-d5-vario-body-screwring-wc-141-xs.html There are also passive cooling way's like thermall encapsulating potty for better heat transfer . Usually used in encapsulating electric motor windings - recuces air gap and yield's better thermal https://electrolube.com/product/er2183thermally-conductive-epoxy/tranfer t outer case to radiate out 

Gr

lamonz88
Offline
Last seen: 3 months 5 days ago
Joined: 2020-02-07 18:53
Posts: 9

Hi . I there any progress with your custom made Foc controller ? It must be difficult to get anything going because of the Covid -19 ! I'm cheching this page almost everyday LoL 

Gr

Kalzifa
Offline
Last seen: 6 months 19 hours ago
Joined: 2020-04-23 14:27
Posts: 4

Anything new? When is the next batch going to be produced? I want to buy a controller.

 

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Yes, working hard to improve the design. The big change is that the controller will have now three boards: power stage on the Al substrate, then DC link board with capacitor banks sandwiched to it, and a control board with digital and analog circuitry on top. The focus is to maximize the performance and reliability. The plan is it get a small batch made in May. 

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

graykim
Offline
Last seen: 2 years 2 weeks ago
Joined: 2018-12-08 01:12
Posts: 2

Great work! I love the use of Fairchild FETs they are seriously good and well worth the extra money. 

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

The Design has undergone some major revision. It's a three board design now: 

1. Aluminum substrate power stage at the bottom providing the best thermal interface with the heatsink

2. DC link + Driver + Sensing board on top

3. Control board plugged into the DC Link board away from high voltage current tracks

Among other improvements, increased isolation barrier for signal integrity, embedded contactor circuit with precharge/arc handling, on board BLE, WiFi connectivity for easy firmware updates.

Optional but easy to add: SD card for data logging, GPS/GSM module for alarm, tracking, etc.

Boards are being built now, I should have a few working prototypes pretty soon.

 

 

2020-04-16_12-48-49.jpg

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

eptv
Offline
Last seen: 1 month 2 weeks ago
VESC Original
Joined: 2018-10-21 21:20
Posts: 35

CANbus implemented?

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Yes. 

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

Kolt10
Kolt10's picture
Offline
Last seen: 4 years 6 months ago
Joined: 2020-05-14 19:39
Posts: 1

@Vadicus I am interested in ordering one of these units. Anyway to get in to the pre-order for May still?

MX E-Bike Enthusiast

Kalzifa
Offline
Last seen: 6 months 19 hours ago
Joined: 2020-04-23 14:27
Posts: 4

I am too, happy to test out the new hardware.

If you need testers I am sure you will find enough people in this thread

EngSammy
Offline
Last seen: 7 months 3 weeks ago
Joined: 2020-03-05 13:08
Posts: 6

This is looking good and in a small form factor . Your 3 board setup is the way to go which is standard in high performance controllers ( cirtus for example) . 

They use custom made busbars to move current from AluPCB  to DC-Link PCB. Check the circled Items in the image . However for the phase they use those circular non-standard current sensors to save them from going into the DC-link PCB. just an idea if you havenot seen it before. In your design it is clear how are u moving current from buttom PCB to middle PCB ?

1.jpg

EngSammy
Offline
Last seen: 7 months 3 weeks ago
Joined: 2020-03-05 13:08
Posts: 6

One more thing , infineon introduced lately this package PG-HSOG-8-1:  https://www.infineon.com/cms/en/product/packages/PG-HSOG/PG-HSOG-8-1/

This is similar to PG-HSOF-8-1 . However it has pins like the traditional packages. they recommend this because is more suitable for aluminum pcbs because of the different thermal expansion , this can protect the pins from cracking , however I cannot find the App note right now.

Regards

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Thanks for the tip on the mosfet package. The power stage is designed to accept "legged" packages such as D2PAK if needed but I am yet to confirm there is a benefit using those. Legless mosfet package allows to decrease the parasitic inductance. Thermal expansion may not be an issue on Al substrate as the whole heat dissipation is at least 2x better then on FR4, so the controller will run pretty cool in the first place. The power roll back is also set at around 90C or so. 

Regarding the current loop current sensors, I've evaluated those and decided against them early on due to cost, availability and accuracy. 

 

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

NuRxG
Offline
Last seen: 3 months 1 week ago
VESC Free
Joined: 2018-09-05 09:53
Posts: 17

Any chance this has an IMU?





 

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

There is a chance if you add it. It's like $10 or less.

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Wireless/BT touch display is now an option for the 24F controller: https://vesc-project.com/node/1814

Telemetry dashboard is implemented. Now, working on adding MC and APP configs. It will be possible to set up new motors and adjust parameters from the display. 

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Getting closer to shipping out the first batch of pre-orders. Also, working on optimizing production to make them faster. 

IMG_5570.jpeg

 

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

metri
Offline
Last seen: 9 months 1 week ago
Joined: 2018-11-02 04:19
Posts: 2

What's the time between ordering and shipping? 

Thanks!

Kalzifa
Offline
Last seen: 6 months 19 hours ago
Joined: 2020-04-23 14:27
Posts: 4

How can I order one? On the powervelocity website it always says there are not enough in stock, even for preorder? Also has the prive gone up to 599 from 499?

 

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Right now shipping  only to beta testers. There will be a stock of controllers (in CA, US), so the shipping will pretty fast within the US.

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

No stock at the moment. The controllers are shipped only to beta testers. There will be stock pretty soon.

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Just tested variable regen signal on Magura brake lever. A hall sensor is hidden in the hydraulic line housing.

I have been using a separate throttle on the left side of the handlebar which works fine but this makes it all more intuitive. 

 

 

 

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

RoopeKuisma
Offline
Last seen: 3 years 8 months ago
Joined: 2020-05-10 21:56
Posts: 3

Take-my-money-e1438181973663.jpg

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Thank you for your generosity. We'll start accepting money in volumes pretty soon. Stay tuned!

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Pre-orders are reopening soon. Stay tuned.

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

The most powerful VESC money can buy is officially here ;)

 

new_shell_1.jpg

 

new_shell_2.jpg

 

 

 

new_shell_3.jpg

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

lamonz88
Offline
Last seen: 3 months 5 days ago
Joined: 2020-02-07 18:53
Posts: 9

Hi . When we're be able  to order this new controller . ? Or  this is only  Build to Order . ! If it can handle 40kW to 50kW peak many DiY builders will be interested in  this . On Facebook group loads of people ae struggling with Asi bac controllers . Sevcon are too complicated . https://www.facebook.com/groups/electricmotorcyclebuilds  

Gr

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

The controller now supports real-time logging. 

Pretty much any data can be streamed directly to a database and becomes immediately available as a graph.

This is just a simple example accelerating and braking on a bike. 

2020-11-04_18-17-11.jpg

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

tul00985
Offline
Last seen: 1 year 7 months ago
Joined: 2018-06-11 13:13
Posts: 19

Hi vadicus,

is there a way to pre-order/order/beta Test?

 

I have a customer who has an interest in buying one of your controller for testing. And i would like to tell him when it will be available.

 

greetings john

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Yes, beta testers located within the continental US are welcome at this time provided they are also properly set up for high power testing (above 80v and 300A ideally). Please feel free to send a private message if you meet the criteria.

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

TheRealJohnnyB
Offline
Last seen: 11 months 2 weeks ago
Joined: 2020-12-07 19:17
Posts: 1

I sent you a PM. 

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Yes, got it and a reply is now sent. Thank you.

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

AmpEater
Offline
Last seen: 10 months 3 weeks ago
VESC Free
Joined: 2019-07-06 20:27
Posts: 1

You've got a PM about my ability to beta test at high power levels. 

 

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

I got it and responded. Thank you.

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Started exploring the latest firmware version. Here is the test of the MTPA. 

 

 

 

NextGen FOC High voltage 144v/34s, 30kw (https://vesc-project.com/node/1477)

Johnny Danger
Johnny Danger's picture
Offline
Last seen: 1 year 4 months ago
Joined: 2020-12-16 15:37
Posts: 2

I have been following this for some time now...any update? How far are we from the next batch? Will I be able to buy one soon? I am almost ready with my built (Husqvarna te 250 with QS 138 V3) and the next step is a HV vesc like yours. 110V nominal (30s) and 120A continous, 200/220A burst is all I need. Electronic engineer and rc heli pilot with 25 years+ building experience, pretty sure I know what i am dealing with. Happy to pay for some shipping to the other side of the pond, too... thanks! wink

vadicus
Offline
Last seen: 3 days 13 hours ago
VESC Free
Joined: 2018-08-17 07:26
Posts: 431

Thanks for checking in. Have been recently testing fw5.2, seems to be working fine after some tweaking. 

Yes, that's kind of testers I am looking for. In fact, I've been using a couple of qs138s for most of bench testing and they run pretty well. Send a private message and we'll have one ready for you.  

 

 